If I was a betting woman (which I'm really not), I would declare that the walls of hell are probably lined with horsehair plaster.
I have no photographic evidence because I left my phone at home all weekend, but I will be dropping by to take some photos during the week. Back to the horsehair..........
When I arrived on Saturday, my poor hubby was stuck up in the filthy 70 year old ceiling dealing with the ceiling insulation. The amount of dirt that came down with that was UNBELIEVABLE.
Then we came to stripping the plaster off the walls. It is heavy with a capital H, and it is FLOPPY! Yes that's right. So you kind of have to drag it unless you cut it into smaller pieces.......
Enter the jigsaw - yay! Gottal love a power tool AND I was allowed to wield :) Oh happy days! Smaller pieces meant I could help more and we were getting more done. BUT - and there is always a but. Said beautiful power tool made more dust and it stinks. Thank god for goggles and masks but my hair will never be the same!
We stripped 2 rooms and dropped 2 ceilings. I am going to add that to my resume - needs recognition I reckon!
Between just the 2 of us we filled a 4 cubic metre skip this weekend and achieved 1/2 of what we have three weekend to do. Next weekend will be stripping another room and general site clean up so it is beautiful. Lots achieved this weekend and the photos will be up later in the week.
Hey, Are you still building the Glenview? When is Clarendon due to start?